The Problem

Section 8 housing that had a extensive demolition.

Traditional Solution

Fire Walls needed to be repaired. There was extensive damage to the walls after a flood. The new code required 2 layers of gypsum and the project only had room for 1 layer.

Estimated Savings

$63,300

Actual Time Savings

45 Calendar
Days

FlameOFF Solution

Apply fire coating to wall and ceiling areas requiring the additional rating. With the use of the Intumescent coating the problem was solvable by coating.