The Problem

Open Floor/Joists system that need to be upgraded to the 1 hour fire protection for historic main street.

Traditional Solution

Add two layers of gypsum on the ceiling and cover the historic wood joists.

FlameOFF® Solution

Apply fire coating to ceiling areas requiring the additional rating. With the use of the Intumescent coating the problem was solvable by coating.

Estimated Savings

$18,300

Actual Time Savings

15 Calendar
Days