AMU Surgeons

The Problem

40,000 sq ft existing wood ceiling requires upgrading to ASTM E119, 1 hour rating due to change in occupancy from Medical Office to Ambulatory Surgical Center.

Estimated Costs

$300,000

Estimated Time

90 Calendar
Days

Traditional Solution

Install structural upgrades to accommodate for adding 2 layers of gypsum wallboard to be installed on a 8’ high existing ceiling.

Estimated Savings

$228,000

Actual Time Savings

82 Calendar
Days

FlameOFF Solution

Applied the engineered coating thickness to all wood ceiling members.