The Problem

The property was installed with one layer of 1/2 unrated gypsum board 24 o.c. The rating required was 1 hour.

Traditional Solution

Add a extra layer of gypsum to the existing structure. This would also require taping, mudding, and painting the new layer.

FlameOFF® Solution

Applied the engineered coating thickness to the existing layer of gypsum to meet the 1 hour requirement for the floor/ceiling assembly.

Estimated Savings

$6,500

Actual Time Savings

2 Calendar
Days