Urban Housing Authority

The Problem

Assisted living facility that had a extensive demolition.

Traditional Solution

New doors, door trim and removal of kitchen equipment and very labor extensive and project would have carried into a month.

FlameOFF Solution

Apply fire coating to wall and ceiling areas requiring the additional rating. With the use of the Intumescent coating the problem was solvable by coating the areas within 3 days.

Estimated Savings

$1,500

Actual Time Savings

27 Calendar
Days