Urban Housing Authority

The Problem

Assisted living facility that had a extensive demolition.

Traditional Solution

New doors, door trim and removal of kitchen equipment and very labor extensive and project would have carried into a month.

Estimated Savings

$1,500

Actual Time Savings

27 Calendar
Days

FlameOFF Solution

Apply fire coating to wall and ceiling areas requiring the additional rating. With the use of the Intumescent coating the problem was solvable by coating the areas within 3 days.