Exposed wood joists and wood subfloor, support beams and support posts, required a 1 hour fire rating.
Install a sprinkler system (Dry System).
Install two layers of gypsum board as the new ceiling.
Apply fire coating at the engineered required thickness to all wood ceiling and beam/beam post members.